Member state | SLOVENIA |
Case study | Lendava |
Description | Local community Lendava covers 123 km2 in Pomurje region. In Lendava there is one of few Slovenian geothermal district heating systems. Production borehole Le-2g was drilled in 1994 and reinjection borehole Le-3g in 2007. |
Region>City>location | Region: Pomurje, City: Lendava |
Installed capacity ( MWth) |
2,72 |
Installed geothermal capacity | 6 – 8 MW (at max. potential use) |
DH length (m) |
3200 |
Inhabitants connected | school, kindergarten, multi-dwelling houses etc. (nearly 52000 m2) |
Operating Temperature of the DH | 40-66°C |
Temperature of the geothermal ressource (production – injection) |
77,4 °C |
Production of heating and/or cooling | 31,7 TJ/a (heating) |
Investement for geothermal well |
2.940.000 € |
Investement for geothermal heating station |
1.265.000 € |
Investement for DH network and substation |
included in heating station |
Financing (banks, funds, PPP…) |
Nafta Geoterm (now Petrol Geoterm), Ministry, EU fund |
Cost of the MWh sold | 79,30 EUR |
Comparison with fossil energies | 9 -12 t/a CO2 emissions (max. potential of well) |
Lendava
Bookmark the permalink.